Webwww.fhwa.dot.gov
Addressing Resilience in Project Development - fhwa.dot.gov
WebFHWA Synthesis of Approaches for Addressing Resilience in Project Development Developed by the Federal Highway Administration (FHWA), this report summarizes lessons and findings from a range of research … WebFHWA-HEP-18-021 Also available as Adobe PDF(11 MB) Case Study Snapshot Purpose:The US 34 study was performed by the research team to investigate the combined impacts of changing precipitation and wildfire risk on the performance of a culvert structure. Location:US 34 between Estes Park and Loveland, Colorado. body masters power squat
Addressing Resilience in Project Development - fhwa.dot.gov
WebSep 3, 2024 · FHWA has partnered with State Departments of Transportation (DOTs), Metropolitan Planning Organizations (MPOs) and others to develop and deploy resilience solutions to current and future extreme weather events, reducing future maintenance costs over the full life-cycle of transportation assets. WebFHWA→Environment→Sustainability→Resilience→Ongoing And Current Research→TEACR→I-10 Bayway, Mobile Bay, Alabama Sea Level Rise and Storm Surge Impacts on a Coastal Bridge This study based in Mobile Bay, Alabama focused on the vulnerability of a coastal bridge to sea level rise, storm surge, and waves. 1 Site Context … WebMay 10, 2024 · FHWA-HEP-17-015 Also available as Adobe PDF(1.8 MB) This is one of nine engineering case studies conducted under the Transportation Engineering Approaches to Climate Resiliency (TEACR) Project.[1] This case study focused on the vulnerability of a barrier island roadway to overwashing from sea level rise and storm surge. Overview … body masters replacement cable